Loading...

Cruise Ship Lifeboat Weekly Inspection

Cruise Ship Lifeboat Weekly Inspection

Weekly inspection checklist for shipboard lifeboats to verify release mechanism function, engine start readiness, provisioning completeness, and davit condition in line with SOLAS Chapter III expectations.

Inspection Details

  • Vessel name
    Enter the ship name or vessel identifier.
  • Inspection date and time
    Record the date and time the weekly inspection was completed.
  • Lifeboat identifier
    Enter the lifeboat number, station, or side designation.
  • Inspector name and rank
    Record the person completing the inspection and their role or rank.

Lifeboat Exterior and General Condition

  • Hull, canopy, and exterior surfaces free of visible damage or corrosion
  • Access hatches, doors, and closures operate properly and seal securely
  • Painter line, painter release, and securing arrangements in serviceable condition
  • Interior is clean, dry, and free of loose gear or obstructions

Release and Launching Arrangements

  • Release mechanism functions correctly and returns to safe position
  • Release hooks, interlocks, and safety pins are intact and properly secured
  • Davit arms, falls, blocks, and winch components show no visible defects
  • Launching area is clear of obstructions and ready for emergency use

Engine and Propulsion Readiness

  • Engine starts within the required time and runs smoothly
  • Fuel level is sufficient for emergency operation
    Record the fuel quantity or percentage available for the lifeboat engine.
  • Engine controls, throttle, steering, and cooling discharge operate normally
  • Battery, starter, and associated electrical connections are serviceable

Provisions and Required Equipment

  • Required provisions and survival equipment are complete and stowed correctly
  • Water, rations, first aid kit, signaling devices, and thermal protection are present
    Select all required categories verified during the inspection.
  • Portable equipment and loose items are secured and accounted for

Deficiencies, Corrective Actions, and Sign-Off

  • Deficiencies or non-conformances identified
    Describe any defects, missing provisions, or operational issues found during the inspection.
  • Corrective action taken or work order raised
    Record the corrective action, temporary control, or maintenance request number.
  • Photo evidence of critical deficiency or condition
    Attach photos when a critical item fails or when evidence is needed for verification.
  • Inspector signature
    Signature of the inspector completing the weekly lifeboat inspection.
Ask AI Template Studio

Let's customize Cruise Ship Lifeboat Weekly Inspection.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?