Control Plan Adherence Audit
Control Plan Adherence Audit
Inspection template for auditing adherence to a manufacturing control plan, including CTQs, inspection frequencies, measurement systems, and reaction plans.
Control Plan Availability and Revision Control
- Current approved control plan is available at the workstation
- Control plan revision matches the latest released document
- CTQs, inspection points, and reaction plans are clearly identified in the control plan
- Temporary deviations or containment actions are documented and authorized
CTQ Characteristics and Product Checks
- Required CTQ characteristic is being checked at the specified operation
- CTQ acceptance criteria match the control plan specification
- Inspection results are recorded for each required lot, batch, or unit
- Measured CTQ value
- CTQ result status
Inspection Frequency and Timing
- Inspection frequency matches the control plan requirement
- Last inspection time
- Next inspection due time
- Inspection interval in minutes
Measurement System and Equipment
- Measurement device or gauge is identified in the control plan
- Measurement device is within calibration date
- Measurement method is appropriate for the CTQ and provides required resolution
- Measurement system identification
- Calibration due date
Reaction Plan and Escalation
- Reaction plan is defined for out-of-spec CTQ results
- Operator can describe the immediate containment action
- Escalation path to supervisor, quality, or engineering is posted and understood
- Recent non-conformance or stop-call-fix record reviewed
- Reaction plan response time in minutes
Ask AI
Template Studio