Brick Extruder and Pug Mill Pre-Operation Inspection
Brick Extruder and Pug Mill Pre-Operation Inspection
Pre-operation inspection for a brick extruder and pug mill covering vacuum readiness, auger condition, water addition, die mounting, and startup readiness for cutting.
Inspection Details and Startup Authorization
- Inspection date and shift recorded
- Inspector name and role recorded
-
Equipment identification matches the unit to be started
Record the machine ID, line number, or asset tag for the extruder/pug mill being inspected.
-
Lockout-tagout cleared and startup authorized by competent person
Confirm the machine is released for startup and no active LOTO devices remain on the equipment.
Vacuum System and De-Airing Readiness
- Vacuum pump operational and at normal running condition
-
Vacuum gauge within the acceptable operating range
Enter the observed vacuum reading for the de-airing system.
- Vacuum hoses, seals, and connections free of leaks or visible damage
- Vacuum chamber and access points clean and properly closed
- Vacuum relief, alarms, or indicators functioning as expected
Auger, Barrel, and Material Feed Condition
- Auger condition acceptable with no abnormal wear, cracks, or missing sections
- Barrel, liner, and wear surfaces free of obstruction or buildup
- Feed hopper contains only approved material and is free of foreign objects
- Material feed rate controls and guards in place and functional
- No unusual noise, vibration, or binding observed during jog or pre-start check
Water Addition, Mix Consistency, and Die Mounting
-
Water addition system set to the specified process rate
Enter the water addition setting or target percentage used for the batch.
- Water lines, valves, and spray points free of leaks and blockage
- Material consistency suitable for extrusion without excessive dryness or slumping
- Die mounted securely, aligned, and free of cracks or damage
- Die face, adapter, and mounting hardware tightened to specification
Column Formation, Cutting Readiness, and Final Safety Check
-
Column is forming evenly and ready for cutting
Confirm the extruded column is stable, continuous, and suitable for the cutting stage.
- Cutting area clear, guarded, and free of obstructions
- Guards, emergency stops, and controls accessible and functional
- Housekeeping clear around extruder, pug mill, and cutting station