Loading...

Aerial / Boom Lift Pre-Operation

Aerial / Boom Lift Pre-Operation

ANSI A92.20 + OSHA 1926.453 daily pre-op for boom-supported elevating work platforms. Required before each shift; failures take the unit out of service.

Inspection Setup and Documentation

  • Equipment identification recorded
    Record unit ID, make/model, and serial number.
  • Inspection date and start time recorded
    Document when the pre-operation inspection was completed.
  • Operator/inspector identified and authorized
    Record the name or employee ID of the person performing the inspection and confirm they are authorized to operate or inspect the equipment.

General Condition and Walk-Around

  • No visible structural damage, cracks, bends, or missing components
  • No hydraulic, fuel, or battery fluid leaks present
  • Tires, wheels, and outriggers/leveling devices in serviceable condition
  • Guardrails, gates, and platform entry chain/closure intact
  • Platform deck, toe boards, and attachment points free of damage and debris

Controls, Safety Devices, and Emergency Systems

  • Emergency stop functions at ground and platform controls
  • All lift, lower, rotate, telescope, and drive controls operate smoothly and return to neutral
  • Horn or audible warning device operates
  • Tilt alarm, load-sensing, and other manufacturer-required warning devices function
  • Platform and ground control labels, placards, and operating instructions legible
  • Emergency lowering system operates as intended

Power Source and Fluid Levels

  • Battery charge / fuel level adequate for planned work
  • Battery terminals, cables, and connectors secure and free of damage
  • Engine oil, hydraulic oil, and coolant levels within manufacturer range

Operational Test

  • Drive and steering function correctly at low speed
  • Boom articulation, extension, and platform leveling function correctly
  • Brakes hold and machine stops as expected
  • No unusual noise, vibration, smoke, or odor during operation

Final Disposition

  • Unit cleared for service
  • Deficiencies documented and unit tagged out of service if needed
  • Inspector signature
Ask AI Template Studio

Let's customize Aerial / Boom Lift Pre-Operation.

Tell me how you'd like to adapt it. For example:

  • Add a question about delivery time.
  • Make it shorter — 5 questions max.
  • Tailor it for the hospitality industry.
  • Translate the labels into Spanish.
Ask AI Product Advisor

Hi! I'm the MangoApps Product Advisor. I can help you with:

  • Understanding our 40+ workplace apps
  • Finding the right solution for your needs
  • Answering questions about pricing and features
  • Pointing you to free tools you can try right now

What would you like to know?