Pile Driving Daily Log
Pile Driving Daily Log
Daily field log for recording pile driving progress, blow counts, refusal criteria, hammer performance, and embedment measurements.
Log Details
-
Log Date
Select the date the pile driving work was performed.
-
Project Name
Enter the project or site name.
-
Work Location
Enter the specific area, structure, or station where pile driving occurred.
- Shift
Pile and Driving Setup
-
Pile ID
Enter the pile identifier or mark number.
- Pile Type
- Hammer Type
-
Lead and alignment verified?
Confirm the leads, alignment, and positioning were checked before driving.
Driving Progress
-
Driving Start Time
Record when driving began for this pile.
-
Driving End Time
Record when driving stopped for this pile.
-
Embedment Depth Achieved
Enter the total embedment achieved during this log period.
- Embedment Unit
Blow Counts and Refusal Criteria
-
Blow Count for Last 10 Inches/25 cm
Enter the number of blows required for the last 10 inches or 25 cm of penetration.
-
Refusal Criteria Reference
Enter the project specification or acceptance criterion used for refusal.
- Refusal reached?
-
Acceptance criteria met?
Indicate whether the pile met the specified driving criteria.
Hammer Performance
-
Rated Hammer Energy
Enter the rated energy used for the hammer during this operation.
- Energy Unit
-
Hammer Performance
Rate hammer performance during the shift.
-
Hammer Issues or Downtime
Describe any malfunctions, delays, or maintenance issues affecting driving.
Exceptions and Sign-Off
-
Exceptions or Unusual Conditions
Document weather, obstructions, refusal anomalies, or other unusual conditions.
-
Corrective Actions Taken
Describe any corrective actions taken in response to exceptions or equipment issues.
-
Submitted By
Enter the name or role of the person completing this log.
-
Field Sign-Off
Optional signature for field verification and audit trail.