A distribution network's whole day, run on one platform
A 60-site network with pickers, drivers and shift leads on every shift. Follow one day at its Northgate site, from a 5 AM call-out to the safety inspector's visit.
A 60-site network with pickers, drivers and shift leads on every shift. Follow one day at its Northgate site, from a 5 AM call-out to the safety inspector's visit.
One day at Northgate, and the busywork that is no longer in it
Eight moments, whose day each one changes, what it used to take, and the template and app it runs on.
Northgate Distribution is a made-up company. Its people, sites and figures are sample content.
-
5:02 AM
Megan
Shift lead
A call-out at 5 AM, and cover found before the shift
Ana calls out for the 6 AM shift. By the time Megan picks up her phone, the Shifts agent has found someone certified and free. She taps Approve.
Before Three phone calls at 5 AM, and a forklift with nobody on it.
Built from Shifts & Scheduling App
The Shifts agent found cover for a Wednesday 6 AM call-out, checked against forklift certification and hours, waiting for the shift lead to approve -
5:45 AM
Marcus
Forklift operator
Every forklift checked before the first pick
OSHA requires a check of every truck before each shift. Marcus does it on his phone, and a failed item stays on record, with what failed, until the truck is repaired.
Before A paper checklist in the cab, signed in a hurry or not at all.
Built from Forklift Daily Pre-Shift Inspection Template Inspections App
The 5:45 AM forklift checks at Northgate, with forklifts 3 and 12 passed and forklift 7 failed for a horn that does not work -
6:00 AM
Keisha
Picker
Every picker knows aisles 12 to 18 move on Monday
The slotting change goes out once, to every site, and Keisha and every other picker confirm they read it before the aisles move. Shift leads see who has not.
Before A printout on the break-room board, read by whoever walked past it.
Built from Warehouse Slotting Change Brief Template Sites App
The slotting change for aisles 12 to 18, read by 41 of 42 at Northgate and 38 of 40 at Elm Street, with Riverside at 29 of 36 and a reminder sent -
9:30 AM
Diego
Forklift operator, week 2
A battery changed right the first time
The procedure walks Diego through it on his phone, one step at a time, with the gear each step needs.
Before Hunting for the binder, or asking whoever was nearby.
Built from Forklift Battery Change & Charging Template SOP Hub App
The forklift battery change procedure on a phone, with the truck parked and the face shield on, and disconnecting the battery as the step in progress -
10:45 AM
Ben
Loader
A near miss at dock 4, reported in seconds
A pallet slips off a forklift at dock 4 and nobody is hurt. Ben reports it from his phone with a photo, and maintenance has the fix before the next truck docks.
Before Nobody reports it, until it happens again.
Built from Safety Hub App
A near miss reported at dock 4, with a photo added and the area marked off, and the dock plate fix with maintenance, due today -
11:40 AM
Megan
Shift lead
The safety inspector asks for every forklift check since January. Megan has them in a minute.
Every pre-shift check the operators logged is on file, with the failed horn on Forklift 7 and its repair beside it. Megan exports the quarter while the inspector waits.
Before Boxes of paper checklists, and the missing shifts an inspector always finds.
Built from Forklift Daily Pre-Shift Inspection Template Inspections App
Northgate's forklift checks from January to March, every truck checked every shift, the one failure and its repair, ready to download for the inspector -
1:40 PM
Hana
New picker
Hana's first two weeks, planned before she walked in
Her forms, her forklift training and a buddy for her first safety walk, each on the day it belongs. Her manager sees what is done and what is next.
Before A stack of forms on day one, and forklift training whenever someone had time.
Built from Warehouse Associate Onboarding (14-Day) Template Onboarding Hub App
Hana Kim on day 3 of her 14-day onboarding, with her forms signed and her safety walk done, and forklift training on Thursday -
7:00 AM · next day
Northgate Distribution headquarters VP of operations
At 7 AM, headquarters sees all 60 sites at once
The same day, across every site, which trucks passed their checks, where the slotting change has been read, which shifts are still open and which trucks are waiting on a repair. No calls and no spreadsheets.
Before Sixty site reports, emailed in by noon.
Built from Forklift Daily Pre-Shift Inspection Template Shifts & Scheduling App
Headquarters at 7 AM, with forklift checks done at 58 of 60 sites, the slotting change read at 59, 1,184 of 1,190 shifts covered and 2 trucks with a failed check
What changed for the people in it
-
Megan
Shift lead
No phone calls at 5 AM, and the inspector's records in a minute.
-
Marcus
Forklift operator
Every check on record, so he knows which truck passed before he climbs on.
-
Hana
New picker
A training plan she can see from day one, before she drives a forklift.
-
Ben
Loader
A near miss reported in seconds, and fixed before it happens again.
The questions Northgate's operations lead asks, answered from its own work
Sample answers. Ask AI answers from your organization's own records.
Who is covering Wednesday 6 AM at Northgate?
Which sites missed the forklift pre-shift check?
What do we do if a forklift fails its pre-shift check?
Try OneMango yourself
Open a working company as its manager or as an employee. It is not Northgate, but it is the real product, so click anything.
Every template in this day, by who uses it
What this day used to take, now one app on every phone
- A scheduling tool, plus phone calls and group texts at 5 AM
- Paper pre-shift checklists in every truck's cab
- Printouts on the break-room board
- The procedures binder in the supervisor's office
- Near misses written up later, or never
- Site reports emailed to headquarters
Shifts, truck checks, site updates, procedures, near misses and onboarding, in one app for every person at every site.
Compare the cost of what it replaces Build the business case
Questions about this example
No. Northgate Distribution is a made-up company, so we can show a whole day without anyone's private data. Every moment stands for a real template and app, linked beside it.
No. Each moment names the app it comes from. Start with the ones your day needs and add the rest later.
No. They activate the app with a mobile number or an employee ID.
Yes. Each template is a starting point. Rename steps, add your sites and make it yours.
See how other organizations run their day
See your own day on OneMango
Every team. Every employee. Every workflow. One people and operations platform — built for the frontline. Since 2008, trusted by 2 million+ users with an NPS of 78.
Rolled out to every employee at AutoZone (125,000), PetSmart (50,000+), A.S. Watson and Raley's (20,000) — and at larger retailers we are not permitted to name.
- Within one business day: a solutions consultant asks about your workforce and what you run today.
- The demo shows your use case: your sites, your frontline roles, your systems.
- It ends with your price: the package and the price for your employee count, not a generic quote.