How to read these example figures

Every target, date, and result on this page is fictional example content for Northstar Works. It is not live company data, an approved target, or evidence of completed work. Replace it with approved figures and confirm each measure's boundary, unit, period, and source before publication.

A result is meaningful only when its reporting scope and comparison basis are clear.

Illustrative progress snapshot

Fictional Northstar Works example. Reporting period ends 30 June 2025; values illustrate labeling and are not company results.

Illustrative progress snapshot
Example measure Illustrative target Example result at 30 Jun 2025 Unit and boundary Example status
Purchased electricity Reduce 10% by 2030 from a 2022 baseline 6% below the 2022 baseline kWh; fictional office sites in scope Illustrative progress; not verified
Water use Reduce 8% by 2030 from a 2022 baseline 3% below the 2022 baseline m³; fictional sites with comparable meter coverage Illustrative progress; not verified
Waste sent for disposal Reduce 15% by 2030 from a 2022 baseline 9% below the 2022 baseline tonnes; fictional sites with recorded waste weights Illustrative progress; not verified

What a progress figure needs

Check that the figure names:

The measure

The unit

Location or meter boundary

Reporting dates

Comparison baseline

Measured or estimated

Source records

Source records should cover the stated period and boundary.