Each project has reports that can be shown from the “Reports” tab. First visit the project that you would like to see reports for, then click the “Reports” tab as in the below¬†screenshot (Incase you do not see reports, ensure the same is enabled from “Manage ¬†modules” within the project)
Project Reports

The reports that can be generated include:

  • Progress Report
  • Timesheet Report
  • Schedule Report
  • Activity to Task Report

Each type of report can be accessed from the sub-tab ribbon.

Report types

(Visited 266 times, 1 visits today)